Pricing
Solar & Battery Pricing
Bendigo & Regional Victoria
Indicative starting ranges for standard installs. Every quote is based on your actual usage data — so your price may differ from these guides.
Solar-Only Systems
Grid-connect solar. No battery.
Solar Starter
6.6 kW array · 5 kW inverter
From
Price on request
- 6.6 kW panel array
- 5 kW grid-connect inverter
- Standard roof mount
- Grid connection
- Monitoring setup
Ideal for smaller households wanting to reduce bills without over-capitalising.
Get a QuoteSolar Mid
10 kW array · 8 kW inverter
From
Price on request
- 10 kW panel array
- 8 kW inverter
- Standard roof mount
- Grid connection
- Monitoring setup
Suits medium to large households with daytime consumption.
Get a QuoteSolar Max
13.2 kW array · 10 kW inverter
From
Price on request
- 13.2 kW panel array
- 10 kW inverter
- Standard roof mount
- Grid connection
- Monitoring setup
Large households or those planning to add EV charging and/or battery later.
Get a QuotePrices are indicative for standard installs. STC rebates applied. See “What changes price” below.
Battery Add-Ons
Retrofit to existing solar, or added alongside a new system.
Battery Add-On — Small
5–7 kWh usable capacity
From
Price on request
- 5–7 kWh battery
- Inverter/charger if required
- Switchboard integration
- Monitoring setup
Suits smaller households or those wanting partial overnight coverage.
Get a QuoteBattery Add-On — Standard
10–13 kWh usable capacity
From
Price on request
- 10–13 kWh battery
- Inverter/charger if required
- Full overnight coverage
- VPP-ready config
Most common size for Bendigo family homes. Covers overnight usage for most households.
Get a QuoteInteractive Tool
Estimate Your System
Select your situation below for an indicative system size and price range.
Select all options above to see your indicative estimate.
EV Charger Add-On
EV charger installation (AC Level 2 / 7 kW) is available as a standalone job or combined with solar and battery installation. Contact us for pricing specific to your switchboard and site.
Get EV Charger QuoteWhat Changes the Price?
Switchboard condition
Older switchboards may need upgrading to safely support a solar system. We assess this during site inspection.
Roof type and access
Metal roofs, steep pitches, or difficult access add installation time and cost.
Shading
Trees, chimneys, or adjacent rooflines may require optimisers or affect system size.
Single vs three-phase power
Three-phase homes may require a different inverter configuration.
Distance from switchboard
Longer cable runs from panels to switchboard add material and labour cost.
STC rebates
Federal government STC rebates reduce the final price. The rebate amount varies by system size and changes each year.
Finance Options
Contact us to discuss payment options available for your installation.
Get a Quote Based on Your Usage
These are indicative starting ranges. Your actual quote is based on your real consumption data, site conditions, and system design.
Get My Personalised Quote